The Performance of Transportation Projects Funded By Foreign Loan in Indonesia (2006-2010)

Putranto, Leksmono Suryo and Karyana, Yudi and Damantoro, Tory and Wicaksono, Madyaswanto Budi (2012) The Performance of Transportation Projects Funded By Foreign Loan in Indonesia (2006-2010). In: The 8th International Conference on Traffic and Transportation Studies, 1-3 August 2012, Changsha, China.

[img]
Preview
Text
2012 ICTTS 2012-Full Paper-The Performance of Transportation Projects Funded By Foreign Loan in Indonesia.pdf - Submitted Version

Download (378kB) | Preview
Official URL: https://www.sciencedirect.com/science/article/pii/...

Abstract

Many Indonesian transportation projects was funded by foreign loans, e.g. projects in Ministry of Transport and Ministry of Public Works. The data used were from Indonesian National Development Planning Agency quarterly report (2006-2010). Descriptive statistics analysis was conducted to the progress variant for each directorate generals. Some t-tests were done to obtain whether in the observation period the mean progress variant for each directorate general was indicating serious delay. Serious delay projects characteristics was mapped. The percentage of serious delay worsened between 2006-2009. Overall serious delay rate was 39%. In general, serious delay occurance started when elapsed time reach 30-40%.

Item Type: Conference or Workshop Item (Paper)
Subjects: Penelitian
Penelitian > Fakultas Teknik
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Leksmono suryo putranto
Date Deposited: 12 May 2018 18:05
Last Modified: 16 Apr 2021 03:12
URI: http://repository.untar.ac.id/id/eprint/1820

Actions (login required)

View Item View Item