Analisis estimasi biaya pekerjaan non standar bangunan gedung negara pada penyelenggaraan tradisional dengan metode analytical hierarchy process

Nugroho, Yanuar Seto (2016) Analisis estimasi biaya pekerjaan non standar bangunan gedung negara pada penyelenggaraan tradisional dengan metode analytical hierarchy process. Masters thesis, Universitas Tarumanegara.

[img] Text
Abstrak Yanuar Seto.pdf

Download (11kB)
[img] Text
Cover Yanuar Seto.pdf

Download (33kB)
[img] Text
Daftar Isi Yanuar Seto.pdf

Download (21kB)

Abstract

This study examines the technical criteria / factors that affect the cost of non-standard work of state building. Estimation of the exact cost of the state building construction is expected to create appropriate state building construction functions, meet the requirements of safety, health, comfort, and convenience. State building construction is a construction of building for official use which became/will be the country’s wealth and held with the source of financing that comes from state funds, and/or other legitimate acquisition. By using Analytical Hierarchy Process methods, obtained factors affecting estimation of cost of non-standard work of state building construction for personnel team estimation consisting of the level of experience (38.1%) and the level of knowledge (30.2%); data/information consisting of specification data (25,5%) and project complexity data (22%); analysis and technical evaluation consisting of planning analysis (18.2%), analysis of life cycle cost (14%), and aspect of the work method (13.6%); and external factors consisting of governmental policy (21%) and project location (13.9%).

Item Type: Thesis (Masters)
Subjects: Tesis > Pascasarjana
Divisions: Pascasarjana
Depositing User: Puskom untar untar
Date Deposited: 28 Jun 2018 09:01
Last Modified: 10 May 2021 07:31
URI: http://repository.untar.ac.id/id/eprint/1929

Actions (login required)

View Item View Item