Analisis percepatan jadwal pelaksanaan proyek (studi kasus: Tunas Toyota Cipondoh)

Sony, Sony (2017) Analisis percepatan jadwal pelaksanaan proyek (studi kasus: Tunas Toyota Cipondoh). Masters thesis, Universitas Tarumanagara.

[img] Text
Cover Sony.pdf

Download (33kB)
[img] Text
Abstrak Sony.pdf

Download (19kB)
[img] Text
Daftar Isi Sony.pdf

Download (48kB)

Abstract

Investment in construction in general apply for loans of development funds from the bank, but the high interest of bank loans caused difficulties for the investor in playing the interest during the construction process. It can be anticipated to accelerate the implementation of construction so as to be efficient and effective in the use of project funds. Accelerating the construction process can facilitate investors in return on capital construction borrowed from banks. This urges the researchers to determine the target acceleration duration of the project and determine the influence of the cost required to accelerate. This research data obtained from consultant planners and contractors. The results obtained from the methods of acceleration is expected to reduce implementation time and is useful for analysis in the next project.

Item Type: Thesis (Masters)
Subjects: Tesis
Tesis > Pascasarjana
Divisions: Pascasarjana
Depositing User: Puskom untar untar
Date Deposited: 29 Jun 2018 06:30
Last Modified: 11 May 2021 14:36
URI: http://repository.untar.ac.id/id/eprint/2209

Actions (login required)

View Item View Item