Perbandingan metode earned value method dan earned schedule dalam memperkirakan durasi pelaksanaan struktur atas proyek di Jakarta (TS - 2188)

Prasetya, Jovan (2016) Perbandingan metode earned value method dan earned schedule dalam memperkirakan durasi pelaksanaan struktur atas proyek di Jakarta (TS - 2188). Skripsi thesis, Universitas Tarumanagara.

Full text not available from this repository.
Item Type: Thesis (Skripsi)
Subjects: Skripsi/Tugas Akhir
Skripsi/Tugas Akhir > Fakultas Teknik
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: TDI Family perpus
Date Deposited: 30 Apr 2021 16:37
Last Modified: 30 Apr 2021 16:37
URI: http://repository.untar.ac.id/id/eprint/26735

Actions (login required)

View Item View Item