Jonathan, Raymond (2021) Perbandingan Perhitungan Volume Pekerjaan Dak Beton Bertulang Antara Metode Building Information Modeling dengan Konvensional. Skripsi thesis, Universitas Tarumanagara.
Text
325170087_Raymond Jonathan_05 Abstrak.pdf Download (409kB) |
|
Text
325170087_Raymond Jonathan_03 Lembar Pengesahan.pdf Download (320kB) |
|
Text
325170087_Raymond Jonathan_06 Lembar Pernyataan.pdf Download (321kB) |
|
Text
325170087_Raymond Jonathan_07 Daftar Isi, Tabel, Gambar, Lampiran.pdf Download (664kB) |
|
Text
325170087_Raymond Jonathan_01 Cover.pdf Download (331kB) |
|
Text
325170087_Raymond Jonathan_04 Kata Pengantar.pdf Download (399kB) |
|
Text
325170087_Raymond Jonathan_02 Lembar Persetujuan.pdf Download (318kB) |
Abstract
As the development of technologies, there are engineers who still have a limit about technologies that can help them on their project. One of the technologies in construction field is Building Information Modelling (BIM). BIM is an innovation from Information Communication Technology (ICT) on the construction world. Applications from BIM that will be used in this research are Cubicost Take-off Architecture & Structure (TAS) for concrete working volume calculation and Cubicost Take-off Reinforcement Bar (TRB) for reinforcement working volume calculation. In this research, the writer has a purpose to compare the calculation of roof plate working volume between Building Information Modeling method with conventional method. Based on the result, using Cubicost to calculate roof plate working volume has an accurate result. On concrete working volume calculation with Cubicost TAS, the calculation has a same number with conventional calculation or having 0% differential. On reinforcement working volume calculation between Cubicost TRB and conventional calculation have an accurate result which have a differential by 0.59%. Calculation process with Cubicost who has an automatic system is shorter and not taking much time if it is compared to the conventional which has a step-by-step process and formula that the writer should studied first. Keyword: Building Information Modeling; Cubicost; conventional; working volume; roof plate
Item Type: | Thesis (Skripsi) |
---|---|
Subjects: | Skripsi/Tugas Akhir Skripsi/Tugas Akhir > Fakultas Teknik |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | TDI Family perpus |
Date Deposited: | 28 May 2021 15:18 |
Last Modified: | 28 May 2021 15:21 |
URI: | http://repository.untar.ac.id/id/eprint/29989 |
Actions (login required)
View Item |