Peringkat Faktor-Faktor Yang Mempengaruhi Produktivitas Konstruksi Akibat Penyebaran Virus Covid-19

Anondho, Basuki Peringkat Faktor-Faktor Yang Mempengaruhi Produktivitas Konstruksi Akibat Penyebaran Virus Covid-19. JMTS (Jurnal Mitra Teknik Sipil).

[img] Text
fix_Peringkat Faktor-Faktor Yang Mempengaruhi Produktivitas Konstruksi Akibat Penyebaran Virus Covid-19.pdf

Download (828kB)

Abstract

A construction project is a series of activities as a way to complete an object requested by the owner by optimally utilizing the available resources. Increased productivity in a construction project is also one of the indicators that the project is achieving success, both for the provider and the service provider. However, the spread of the COVID-19 virus in Indonesia, especially the Jabodetabek area which also attacks the construction sector, has caused the productivity of project performance to decrease. Therefore, it is necessary to identify what factors affect construction productivity due to the spread of the COVID-19 virus. Data was collected through a literature study and followed by a survey using a Likert scale questionnaire to service providers in the project. A Likert scale of 1-5 and Relative Importance Index (RII) method are being used to arrange ranking of factors that affect construction productivity due to the spread of the COVID-19 virus. The results of the calculation of the relative importance index (RII) show that the availability of materials and equipment is ranked first with an RII value of 0,96 and the labor availability factor remains in the last rank with an RII value of 0,745.

Item Type: Article
Subjects: Jurnal
Penelitian
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Puskom untar untar
Date Deposited: 21 Dec 2023 07:35
Last Modified: 21 Dec 2023 07:35
URI: http://repository.untar.ac.id/id/eprint/42455

Actions (login required)

View Item View Item