PENENTUAN LOKASI TOWER CRANE PADA PROYEK KONSTRUKSI BERBASIS SIMULASI

Anondho, Basuki PENENTUAN LOKASI TOWER CRANE PADA PROYEK KONSTRUKSI BERBASIS SIMULASI. JMTS (Jurnal Mitra Teknik Sipil).

[img] Text
PENENTUAN LOKASI TOWER CRANE PADA PROYEK KONSTRUKSI BERBASIS SIMULASI .pdf

Download (3MB)

Abstract

Development of high-level building construction projects that require complex equipment that can be used in high-level construction, equipment used to help complete construction projects called heavy equipment. One of the heavy equipment used in high-rise buildings is a tower crane. The use and layout of tower cranes can speed up the schedule and save on project costs. Therefore many methods have been developed to determine the tower crane layout. This study will discuss determining the location of tower cranes by discussing simulations. The location will be determined based on the site map data which is processed in the form of a geometric arrangement and tower crane data specifications. Location determination is done by comparing the total travel time of several simulated locations according to several different speed criteria in a construction project. Speed criteria are divided into four times the jib speed and trolley speed. Location of the location with the total travel time will be taken as the final result. Different speed criteria will make the total travel time change.

Item Type: Article
Subjects: Jurnal
Penelitian
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Puskom untar untar
Date Deposited: 21 Dec 2023 07:49
Last Modified: 21 Dec 2023 07:49
URI: http://repository.untar.ac.id/id/eprint/42459

Actions (login required)

View Item View Item