Wintan, Rius (2022) Penerapan metode two-stage scheduling untuk optimasi perataan tenaga kerja (resource leveling) pada proyek konstruksi jalan di Kalimalang. Other thesis, Universitas Tarumanagara.
Full text not available from this repository.| Item Type: | Thesis (Other) |
|---|---|
| Subjects: | Skripsi/Tugas Akhir Skripsi/Tugas Akhir > Fakultas Teknik |
| Divisions: | Fakultas Teknik > Teknik Sipil |
| Depositing User: | TDI Perpus |
| Date Deposited: | 07 May 2026 03:24 |
| Last Modified: | 07 May 2026 03:24 |
| URI: | https://repository.untar.ac.id/id/eprint/49070 |
Actions (login required)
![]() |
View Item |
