Tangtobing, Reynaldo Farrel Fausta (2023) Perhitungan durasi menggunakan metode earned value dan earned schedule pada pelaksanaan proyek rumah sakit x di Bandung. Other thesis, Universitas Tarumanagara.
Full text not available from this repository.| Item Type: | Thesis (Other) |
|---|---|
| Subjects: | Skripsi/Tugas Akhir Skripsi/Tugas Akhir > Fakultas Teknik |
| Divisions: | Fakultas Teknik > Teknik Sipil |
| Depositing User: | TDI Perpus |
| Date Deposited: | 12 May 2026 01:59 |
| Last Modified: | 12 May 2026 01:59 |
| URI: | https://repository.untar.ac.id/id/eprint/49281 |
Actions (login required)
![]() |
View Item |
