Group by: Item Type | No Grouping
Number of items: 1.

Yohan, Yohan (2015) Analisis harga satuan pekerjaan pengeboran pondasi berdasarkan investasi alat bored pile (studi kasus alat tipe A, tipe B, dan tipe C). Masters thesis, UNIVERSITAS TARUMANEGARA.

This list was generated on Tue Mar 3 20:29:56 2026 UTC.