Penentuan besar nilai mark up pada penawaran harga pekerjaan bangunan hotel

Dwijayanti, Melisa (2019) Penentuan besar nilai mark up pada penawaran harga pekerjaan bangunan hotel. Masters thesis, Universitas Tarumanagara.

[img] Text
327172011_Melisa Dwijayanti_01 Cover.pdf

Download (149kB)
[img] Text
327172011_Melisa Dwijayanti_02 Abstrak.pdf

Download (139kB)
[img] Text
327172011_Melisa Dwijayanti_03 Daftar Isi.pdf

Download (91kB)

Abstract

Cost plan has an important role in construction projects. Every part of activites need cost from preliminary to hand over the project. As an owner representative to control the budget project, a quantity surveyor has to prepare an owner estimate. The owner estimate is a reference to evaluate the quotation in bidding process. The accuracy of calculation owner estimate is very important. Cost-based pricing is one of the strategies in the bidding process, the formula of quotation is cost of the project plus mark up. In the process of bidding, contractors have their consideration of internal and external factors in every project, so they produced a different value of mark up. Many experts made formula for bidding strategy, in Friedman’s and Gates’s formula the value of mark up is determined by probability of winning in every contractor. Purpose of this research is to determine the amount of mark up by Friedman’s and Gates’s formula. The result of analysis with Friedman’s and Gates’s formula is more or less at seven percent of mark up. The result is determined by number and type of competitors.

Item Type: Thesis (Masters)
Subjects: Tesis
Tesis > Pascasarjana
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Puskom untar untar
Date Deposited: 09 Mar 2021 07:22
Last Modified: 09 May 2021 10:55
URI: http://repository.untar.ac.id/id/eprint/14802

Actions (login required)

View Item View Item