WORKLOAD FORMATION WITH DEA AND FTE METHOD IN PT. PLN LOCATED AT BANGKA BELITUNG

Lina Gozali, Pertama and Fransiska Lefta, Kedua and Kenty Lieanda, Ketiga and Lilyana, Keempat and Tio Sampurno, Kelima and Siti Rohana, Keenam WORKLOAD FORMATION WITH DEA AND FTE METHOD IN PT. PLN LOCATED AT BANGKA BELITUNG. WORKLOAD FORMATION WITH DEA AND FTE METHOD IN PT. PLN LOCATED AT BANGKA BELITUNG.

[img] Text
LINA GOZALI WORKLOAD FORMATION WITH DEA AND FTE METHOD DOKUMEN.pdf

Download (2MB)
Item Type: Article
Subjects: Artikel
Depositing User: REKTORAT UNTAR
Date Deposited: 20 Mar 2024 02:23
Last Modified: 20 Mar 2024 02:23
URI: http://repository.untar.ac.id/id/eprint/43328

Actions (login required)

View Item View Item