Lina Gozali, Pertama and Fransiska Lefta, Kedua and Kenty Lieanda, Ketiga and Lilyana, Keempat and Tio Sampurno, Kelima and Siti Rohana, Keenam WORKLOAD FORMATION WITH DEA AND FTE METHOD IN PT. PLN LOCATED AT BANGKA BELITUNG. WORKLOAD FORMATION WITH DEA AND FTE METHOD IN PT. PLN LOCATED AT BANGKA BELITUNG.
|
Text
LINA GOZALI WORKLOAD FORMATION WITH DEA AND FTE METHOD DOKUMEN.pdf Download (2MB) | Preview |
Item Type: | Article |
---|---|
Subjects: | Artikel |
Depositing User: | REKTORAT UNTAR |
Date Deposited: | 20 Mar 2024 02:23 |
Last Modified: | 20 Mar 2024 02:23 |
URI: | http://repository.untar.ac.id/id/eprint/43328 |
Actions (login required)
View Item |