Production activities always require the best method, the best place and the best time. Time analysis required to determine the length of time to complete work. PT X is one medium enterprise company in Indonesia assembles a three wheels bicycle type F-586. Based on the production floor observation known that the assembly process of the three wheels bicycle done manually. Unbalance of task at work stations make the assembling process takes longer time than it should. This study will measure the time of each working element needed to assembly the product. Observation and measurement describe there are 31 of working elements. The average of the longest working element time take place at element no.23 is 304 seconds and the average of the shortest working element time take place at element no.2 is 2.83 seconds. The largest standard deviation is equal to 1.66 second take place at working element no. 24 and for the smallest standard deviation is 0.27 second take place at working element no 13. Key word: time measurement, work elements

Item Type: Article
Subjects: Penelitian > Fakultas Teknik
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Puskom untar untar
Date Deposited: 24 Mar 2017 09:12
Last Modified: 24 Mar 2017 09:12
URI: http://repository.untar.ac.id/id/eprint/118

Actions (login required)

View Item View Item