THE OPERTIONAL PERFORMANCE OF THE JAKARTA BUS RAPID TRANSIT (BRT), LINE EIGHT

Putranto, Leksmono Suryo (2009) THE OPERTIONAL PERFORMANCE OF THE JAKARTA BUS RAPID TRANSIT (BRT), LINE EIGHT. In: Simposium XII FSTPT, Universitas Kristen Petra, 14 November 2009, Universitas Petra, Surabaya.

[img]
Preview
Text
2009 Prosiding Simposium FSTPT XII UnPEtra.pdf - Published Version

Download (239kB) | Preview

Abstract

This paper discusses the performance of the recently operated Jakarta Bus Rapid Transit (BRT), line eight (Lebak Bulus-Grogol). The on bus observation was made on Friday, 13 March 2009 from 5a.m. to 8 p.m. At the beginning of each observation hour, a group of surveyors consist of 2 to 3 persons waited the bus on the Mal Taman Anggrek stop (at Grogol) and took the first available bus. During the travel, the surveyors observed the arrival and departure time of the bus on each stop and number of passengers boarding and alighting on each stop. From these data several performance indicators can be calculated, e.g. total travel time, travel speed between pairs of stops, stop time on each stop, passenger boarding and alighting rates, number of bus passengers between pairs of stops, etc.

Item Type: Conference or Workshop Item (Paper)
Subjects: Penelitian
Penelitian > Fakultas Teknik
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Leksmono suryo putranto
Date Deposited: 17 May 2018 12:15
Last Modified: 16 Apr 2021 03:23
URI: http://repository.untar.ac.id/id/eprint/1840

Actions (login required)

View Item View Item