Jayanto, Samuel Albert (2018) Optimasi kebutuhan tenaga kerja dengan memperhitungkan multi-skilled workers menggunakan metode linear programming (TS - 2292). Skripsi thesis, Universitas Tarumanagara.
Full text not available from this repository.Item Type: | Thesis (Skripsi) |
---|---|
Subjects: | Skripsi/Tugas Akhir Skripsi/Tugas Akhir > Fakultas Teknik |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | TDI Family perpus |
Date Deposited: | 24 Apr 2021 10:08 |
Last Modified: | 24 Apr 2021 10:09 |
URI: | http://repository.untar.ac.id/id/eprint/20321 |
Actions (login required)
View Item |