Wijayanto, Heri (2018) Kajian Efektifitas Penggunaan BIM (Building Information Modeling) dalam Tahap Perencanaan pada Bangunan Industri. Masters thesis, Universitas Tarumanagara.
Text
Tesis Heri, Cover MTS.pdf Download (36kB) |
|
Text
Tesis Heri, Abstrak MTS.pdf Download (10kB) |
|
Text
Tesis Heri, Daftar Isi MTS.pdf Download (40kB) |
Abstract
In a project, problems often occur caused by design changes due to adjustment of construction that affects the additional work. Innovations emerge in every field, especially in the construction planning method Building Information Modelling (BIM) concept. Therefore, this study conducts assessment of effectiveness of planning phase of Building Information Modeling in the industrial building. The research process started by collecting data related to the construction project of palm oil mill those are man- hour data, investment value, human resources necessity, time planning, number of design drawings, and contract value. The result of this research show that BIM methods is shorter and the human resources necessity is less than conventional planning method in finishing the design. The usage of BIM method also can reduce the potential of additional works due to the adjustment of the design. However, the investment of the usage of BIM is more expensive than the conventional method.
Item Type: | Thesis (Masters) |
---|---|
Subjects: | Tesis Tesis > Pascasarjana |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | TDI Family perpus |
Date Deposited: | 04 May 2021 12:53 |
Last Modified: | 04 May 2021 12:54 |
URI: | http://repository.untar.ac.id/id/eprint/27614 |
Actions (login required)
View Item |