Probabilistic Construction Project Duration Prediction Models for High Rise Building Based on Earned Schedule Method in Jakarta

Basuki Anondho, Pertama and Ayomi Dita Rarasati, Kedua and Yusuf Latief, Ketiga and Khrisna Mochtar, Keempat Probabilistic Construction Project Duration Prediction Models for High Rise Building Based on Earned Schedule Method in Jakarta. Probabilistic Construction Project Duration Prediction Models for High Rise Building Based on Earned Schedule Method in Jakarta.

[img]
Preview
Text
BASUKI ANONDHO Probabilistic Construction Project Duration Prediction Models For High Rise Building Based on Earned Schedule Method In Jakarta TURNITIN.pdf

Download (1MB) | Preview
Item Type: Article
Subjects: Artikel
Depositing User: REKTORAT UNTAR
Date Deposited: 13 May 2024 05:43
Last Modified: 13 May 2024 05:43
URI: http://repository.untar.ac.id/id/eprint/43538

Actions (login required)

View Item View Item