Basuki Anondho, Pertama and Ayomi Dita Rarasati, Kedua and Yusuf Latief, Ketiga and Khrisna Mochtar, Keempat
Probabilistic Construction Project Duration Prediction
Models for High Rise Building Based on Earned Schedule
Method in Jakarta.
Probabilistic Construction Project Duration Prediction Models for High Rise Building Based on Earned Schedule Method in Jakarta.
![[img]](http://repository.untar.ac.id/43538/1.hassmallThumbnailVersion/BASUKI%20ANONDHO%20Probabilistic%20Construction%20Project%20Duration%20Prediction%20Models%20For%20High%20Rise%20Building%20Based%20on%20Earned%20Schedule%20Method%20In%20Jakarta%20TURNITIN.pdf)  Preview |
|
Text
BASUKI ANONDHO Probabilistic Construction Project Duration Prediction Models For High Rise Building Based on Earned Schedule Method In Jakarta TURNITIN.pdf
Download (1MB)
| Preview
|
Actions (login required)
 |
View Item |