Florensia, Ineke (2017) Analisis faktor keterlambatan proyek dengan metode delay analysis method using delay section (damuds) pada proyek konstruksi Y di Jakarta (TS - 2229). Skripsi thesis, Universitas Tarumanagara.
Full text not available from this repository.| Item Type: | Thesis (Skripsi) |
|---|---|
| Subjects: | Skripsi/Tugas Akhir Skripsi/Tugas Akhir > Fakultas Teknik |
| Divisions: | Fakultas Teknik > Teknik Sipil |
| Depositing User: | TDI Family perpus |
| Date Deposited: | 30 Apr 2021 15:37 |
| Last Modified: | 01 May 2021 14:05 |
| URI: | https://repository.untar.ac.id/id/eprint/26699 |
Actions (login required)
![]() |
View Item |
