Penentuan rasio struktur bangunan untuk estimasi awal biaya konstruksi

Maximilianus, Martino (2016) Penentuan rasio struktur bangunan untuk estimasi awal biaya konstruksi. Masters thesis, Universitas Tarumanagara.

[img] Text
Cover Maximilianur Martino.pdf

Download (19kB)
[img] Text
Abstrak Maximilianur Martino.pdf

Download (134kB)
[img] Text
Daftar Isi Maximilianur Martino.pdf

Download (165kB)

Abstract

Cost estimation is an activity that is always done in every construction phase. Preliminary estimate is usually done by project’s owner to figure out how much money they will spend. In the preliminary estimate, the detailed data is not available yet. Generally, the available data is architecture drawing only. Therefore, the estimators use structure ratio to calculate structure cost. Structure ratio could be divided into concrete ratio, rebar ratio and formwork ratio. Concrete ratio is a ratio between sums of concrete quantity against building’s area. Rebar ratio is a ratio between sums of rebar quantity against sums concrete quantity. Formwork ratio is a ratio between sums of formwork quantity against sums of concrete quantity. Structure ratio is usually determined by practitioners based on experience from similar projects. In this study, analysis for finding out the precise value of structure ratio was done based on some classifications. The data was taken from a contractor company in Indonesia. The data is classified based on type of buildings. Based on the classifications, data was plotted in graphic to determine upper and lower limit of structure ratio.

Item Type: Thesis (Masters)
Subjects: Tesis
Tesis > Pascasarjana
Divisions: Pascasarjana
Depositing User: Puskom untar untar
Date Deposited: 03 Jul 2018 03:35
Last Modified: 11 May 2021 13:25
URI: http://repository.untar.ac.id/id/eprint/2551

Actions (login required)

View Item View Item