Analisis penyebab contract change order (CCO) yang berpengaruh terhadap kinerja biaya pada proyek konstruksi di Jakarta dilihat dari sudut pandang owner atau konsultan

Yanti, Upik Adri (2014) Analisis penyebab contract change order (CCO) yang berpengaruh terhadap kinerja biaya pada proyek konstruksi di Jakarta dilihat dari sudut pandang owner atau konsultan. Masters thesis, Universitas Tarumanegara.

[img] Text
Abstrak Upik Adri Yanti.pdf

Download (3kB)
[img] Text
Cover Upik Adri Yanti.pdf

Download (17kB)
[img] Text
Daftar Isi Upik Adri Yanti.pdf

Download (145kB)

Abstract

Contract Change Orders often occur in construction project, whether during early, middle, or late stage of project. Contract Change Orders may cause the changing of duration and cost of the project. The aim of this research is to know the causes of change order and the effect that occurs the cost performance in the construction project in Jakarta. Data for the research were obtained by distributing questionnaires to consultants and project owners in Jakarta. The research findings show 4 issues that most influential which are owner / consultant, administrator, change with reason and change with picture detail.

Item Type: Thesis (Masters)
Subjects: Tesis > Pascasarjana
Divisions: Pascasarjana
Depositing User: Puskom untar untar
Date Deposited: 09 Jul 2018 06:31
Last Modified: 11 May 2021 03:31
URI: http://repository.untar.ac.id/id/eprint/3634

Actions (login required)

View Item View Item